[Remote] Mechanical Commissioning Engineer (Data Center Construction Experience)

Remote Full-time
Note: The job is a remote job and is open to candidates in USA. InPwr Inc. is an award-winning electrical design-build firm headquartered in Indianapolis, IN, seeking a seasoned Mechanical Commissioning Engineer. This role involves overseeing the installation, testing, and verification of mechanical systems and equipment to ensure they meet design specifications before operation. Responsibilities • Participate in the planning and coordination of commissioning activities, working closely with project managers, design engineers, construction teams, and other stakeholders to ensure that commissioning activities are properly scheduled and executed • Verify that mechanical systems and equipment are installed according to design specifications, manufacturer's recommendations, and applicable codes and standards. This involves reviewing installation drawings, conducting site inspections, and ensuring proper alignment, assembly, and connections • Perform functional tests on mechanical systems and equipment to ensure they operate as intended. This may include testing components such as pumps, motors, valves, actuators, HVAC systems, plumbing fixtures, and other mechanical devices to verify their performance and functionality • Conduct performance tests to verify that mechanical systems meet performance requirements under normal operating conditions as well as during peak loads or other demanding scenarios. This may involve testing parameters such as flow rates, temperatures, pressures, vibration levels, and energy efficiency • Document all aspects of the commissioning process, including test procedures, test results, equipment specifications, and any modifications or adjustments made during commissioning. Accurate documentation is essential for compliance, future reference, and handover to operations and maintenance teams • Provide training to operations and maintenance personnel on the proper operation and maintenance of mechanical systems and equipment. This helps ensure that personnel are familiar with the systems they will be responsible for operating and maintaining • Ensure that all commissioning activities are conducted in compliance with applicable safety regulations and standards to protect personnel and property. This includes implementing safety procedures, conducting risk assessments, and providing appropriate personal protective equipment (PPE) as needed • Finally, they compile commissioning reports summarizing the results of the commissioning process, documenting any issues or deficiencies identified, and providing recommendations for corrective actions or further optimization • Travel required to different sites. 75% of travel required • Perform a Daily report on site • Be professional in all aspects • Communicate professional to the GC, EC, and Owner • Oversees meetings, schedules, and testing • Lead the Mechanical job and perform a daily meeting with Owner, GC, EC and others • Mechanical team lead on site • Responsible for expense reports and following company policies • Oversees the QA/QC and commissioning on their area of work • Able to create the Final Building report in conjunction with ECx, MCx and FLS • Strong Organizational and documentational Skills • Bachelor of Science of Mechanical Engineering • HVAC, CRAC, AHU, ACCU, others • OSHA 10 • Complete all Safety Certifications • Script development for L2-L5 • Daily Reports • Knowledge of CAD, Bluebeam, and others • Ability to work directly on site, and ability to travel required 75% • Strong foundation in mechanical engineering principles (BSME) • Practical experience with electrical systems and equipment • Excellent problem-solving skills • Attention to detail • Ability to work effectively in multidisciplinary teams • Travel required to different sites. 75% of travel required • Perform a Daily report on site • Be professional in all aspects • Communicate professional to the GC, EC, and Owner • Oversees meetings, schedules, and testing • Lead the Mechanical job and perform a daily meeting with Owner, GC, EC and others • Mechanical team lead on site • Responsible for expense reports and following company policies • Oversees the QA/QC and commissioning on their area of work • Able to create the Final Building report in conjunction with ECx, MCx and FLS • Strong Organizational and documentational Benefits • Medical, Dental, Vision and Life Insurance 100% company paid for employees • Paid vacation & holidays • 401(k) company match • 30-day paid sabbatical every 5 years of employment • Stable employment with a growing company • Highly competitive salary Company Overview • An award-winning design / build electrical contracting firm. It was founded in 2005, and is headquartered in Indianapolis, Indiana, USA, with a workforce of 201-500 employees. Its website is Apply tot his job
Apply Now

Similar Opportunities

Experienced Registered Behavior Technician for In-Home ABA Therapy - Atlanta, GA

Remote Full-time

Immediate Hiring: Experienced Registered Behavioral Technician (RBT) for Clinic-Based ABA Therapy Services

Remote Full-time

Experienced Registered Behavioral Technician (RBT) - ABA Therapy for Children with Autism Spectrum Disorder

Remote Full-time

Experienced Registered Nurse - Telehealth: Providing Remote Care Coordination and Patient Support

Remote Full-time

Experienced Substitute Teacher for Riverside County Schools - Join Scoot Education's Innovative Team

Remote Full-time

Experienced Substitute Teacher for San Bernardino County - Flexible Schedules & Competitive Pay

Remote Full-time

Experienced School Year Instructional Coach for High-Dosage Tutoring Programs in Edgewater Park, NJ

Remote Full-time

Experienced School Year Tutor for K-8 Students in Math and Literacy - Mickleton, NJ

Remote Full-time

Experienced Secondary Social Studies Teacher for Kansas - Flexible Hybrid Remote Arrangement

Remote Full-time

USPS Office Helper

Remote Full-time

Commercial Manager

Remote Full-time

Senior Product Manager

Remote Full-time

Remote Travel Agent at Ishitani Travel Agency Spokane, WA

Remote Full-time

Experienced Remote Data Entry and Analysis Professional for Dynamic Healthcare Team at blithequark – Entry-Level Opportunities with Comprehensive Training and Growth Potential

Remote Full-time

**Experienced Customer Service and Data Entry Assistant – Full Remote Opportunity at blithequark**

Remote Full-time

Software Engineer 2, Delivery Fulfillment

Remote Full-time

[Remote] Onboarding Specialist

Remote Full-time

Experienced Remote Data Entry Specialist – Part-Time Opportunity for Detail-Oriented Individuals to Contribute to Business Success from Home

Remote Full-time

[Remote] AI Data Specialist - Kentucky (US)

Remote Full-time

**Experienced Customer Service Representative – Remote Medical Supply Support**

Remote Full-time
← Back to Home